Welcome to SNTO  blow bottle machine | bottle blowing machine 
[injection necessary] how to do a mold maintenance?
2016-12-29 13:53:22
People need regular physical examination, mold also need. People may be a physical examination once a year, but the mold is different, the mold in the production of physical examination every day, then why the physical examination?. You will know that the mold also need regular physical examination.
In the injection molding machine for the first level maintenance. The first level of maintenance is the production of the mold will occur the following conditions: there will be material splash, lubricating oil volatile lead to insufficient lubrication, parts loose lead to hidden dangers, and other conditions. Do a level of maintenance is very necessary, the first level of maintenance, such as the following:
1, in the production process, every 8 hours need cloth wipe a parting surface dust, oil, raw materials and other foreign material, pay attention to before and after the mold to wipe. Wipe the mirror / mask pattern is prohibited to prevent scratches benevolence.
2, in the production process, every day to die guide pillar, sliding parts coated with a lubricant, a thimble oil (white / transparent and other special products do not play liquid oil thimble). Prevent wear and tear or die.
3, in the production process, each class need to check a mould slider and thimble action if there is an exception, if the top is too long, the spring thimble is broken? If you have found the problem need to immediately stop processing.
4, in the production process, if the mold should be immediately shut down, and promptly notify the monitor process, to prevent mold. It is strictly prohibited to use oblique mouth pliers, knives and other direct access to the mold products, to prevent injury mold. Be careful when you take care of the product!
5, if the production shutdown, regardless of the length of time, the need to immediately turn off the frozen water to prevent mold rust.
6, mold repair, if only half of the mold, the mold on the machine to be protected to prevent damage to the mold.
7, under the mold before the water and mold water blowing clean, wipe clean parting surface, check whether the mold damage. If the mold has the problem to open the mold repair a single mold group processing, product problems need to provide 3 mold samples for repair mold when used; if the mold is no problem spray good rust agent to the unloading area.
8, when the mold problems, please contact the mold group processing, is strictly prohibited to do not understand the mold technology personnel without disassembly, repair mold, in order to prevent damage to the mold.

Contact us

More >>

Zhejiang Huangyan Plastic Machinery Co. Ltd.

Tel: +86-576-84325111

E-mail: snto@snto.com.cn
Address: http://www.snto.com.cn
Address: Taizhou City, Zhejiang province Huangyan District in Jiangkou Road No. 88

Scan QR codeClose